S&E Construction and Maintenance P/L
Traditional Solid Plastering & Cement Rendering
S&E Construction and Maintenance P/L
Traditional Solid Plastering & Cement Rendering
Tara Institute | Buddhist Meditation Centre
3 Mavis Ave, East Brighton Budist
Walls had to be built up from approx. 100mm to 130mm. This involved 5 to 6 applications of sand and cement over a period of a couple of weeks. The final application was then ready for a paint finish.
Mouldings made out of lightweight concrete were then applied last after having been made and cured before final installation. All window seals and walls were made level to the satisfaction of the client.
Tara Institute | Buddhist Meditation Centre
3 Mavis Ave, East Brighton Budist
Walls had to be built up from approx. 100mm to 130mm. This involved 5 to 6 applications of sand and cement over a period of a couple of weeks. The final application was then ready for a paint finish.
Mouldings made out of lightweight concrete were then applied last after having been made and cured before final installation. All window seals and walls were made level to the satisfaction of the client.
No job too big or small
Rough cast applied to columns/peers and sand finish on top.